Wales and West Housing Association Ltd
WWHG requirement under this contract is for a contractor to replace the existing lift at Ty Pontrhun in Merthyr Tydfil. The works includes the dismantling, removal from site and disposal of existing lift equipment and the design, supply, installation, testing, commissioning and setting to work of the single lift.
Further details can be found on eTenderWales (https://etenderwales.bravosolution.co.uk/web/login.shtml) with the reference itt_118382