OPA/T607 OFD Loch Striven – Installation of new ROSOV along with Associated Tank Staging Modifications – Tank 10

Oil and Pipelines Agency

Publication date 20 February 2024, 4:05pm
Closing 26 March 2024, 12:00pm
Contract location
UK - United Kingdom
Lot value
£40,000
Total value £40,000

As a part of futureproofing and improving the tank overfill protection at Loch Striven, it is required to replace the tank-side issue & receipt manual gate valve with an actuated valve and carry out platform modifications to enhance the practicality of operating the asset.

OPA/T607 OFD Loch Striven – Installation of new ROSOV along with Associated Tank Staging Modifications – Tank 10