Integrated Consultancy Team for Under The Bridge Public Realm

Belfast City Council

Publication date 6 December 2024, 10:45am
Closing 24 January 2025, 12:00pm
Contract location
UKN06 - Belfast

The Economic Operator shall provide an Integrated Consultant Team (ICT) with the following capabilities:-
• Project Manager
• Design Team (Landscape Architect, Civil, Structural and Highways Engineer, Mechanical & Electrical Engineer, Cost Manager, Planning Consultant, Traffic Consultant).
• Perform Principal Designer duties in accordance with the Construction (Design and Management) Regulations (NI) 2016;
• This is a one stage contract –i.e. traditional design by Integrated Consultant team from RIBA Plan of Works Stage 0-7 (for which this contract relates). The ICT will also be involved in the contractor procurement process including the production of contractor PQQ & ITT documentation and the evaluation process (select list at PQQ stage and awarded at ITT stage).
• This project is being funded by Belfast City Council.

Integrated Consultancy Team for Under The Bridge Public Realm