London Borough of Barnet
The London Borough of Barnet’s requirements are for the supply of Rubber Crumb materials. The Rubber Crumb will be installed around our tree pits where the roots have raised the footway to a level that becomes a trip hazard. The council we would like a variety of colours to choose from.
The Rubber Crumb will be installed on the footway by our own DLO (Direct Labour Organisation) team, who will install this material around our tree pits where the roots have raised the footway to a level that becomes a trip hazard.
The contract term will be 18 months with no extension period.