UK Atomic Energy Authority
UKAEA requires the supply of a Getter Bed Regeneration System for the Tritium Management System located in the new Lithium Breeding Tritium Innovation (LIBRTI) Facility at Culham Campus. The Getter Bed Regeneration System will provide a fully integrated turnkey Getter Bed impurity treatment solution. This will require the contractor to design, manufacture, install, test, and assist with commissioning of the system.