ED0425-26 Ottery St Mary Weir Repairs and Desilt

East Devon District Council

Publication date 1 July 2026, 2:19pm
Closing 20 July 2026, 11:00am
Contract location
UKK43 - Devon CC
Lot value
£100,000
Total value £100,000

East Devon District Council (EDDC) abstracts water for the Mill Leat (“the Leat”) from the River Otter at the Head Weir, located upstream of Ottery St Mary. The abstraction is controlled by a weir at the upstream end of the Mill Leat (“the Weir”). Deterioration of the Weir structure has resulted in flows bypassing the crest, leading to inadequate water levels in the River Otter for the adjacent Head Weir fish pass and eel pass to function effectively. The proposed works comprise the removal and replacement of the existing Weir structure, together with maintenance dredging of the Leat. The Contractor shall be responsible for obtaining all relevant Environmental Permits.

ED0425-26 Ottery St Mary Weir Repairs and Desilt