Forestry Commission
The works comprise the detailed design, construction, testing and commissioning of a new foul sewer system to replace the existing on site sewage treatment arrangements at High Lodge.
The works include the provision of an approximately 2,037 m foul sewer system, comprising:
• Rising/pumping main
• gravity sewer main
• pumping station
• holding tank
• a connection to the existing Anglian Water foul sewer network.
The works are provided along the pre determined route identified by Forestry England.