WM TRAINS LIMITED
The C10 Overhaul Heavy Maintenance programme is due in 2026 to be performed on the Angel Class 172/0/1 fleet currently on a dry lease with WM Trains. As such, heavy maintenance arrangements are the responsibility of WM Trains and some of the jobs within the C10 specification WMT/172/HM Issue:1 require specialist external supplier support.
An agreement with Wabtec for the Brake Raft Overhaul (job BR 0007) element of the C10 overhaul of Class 172/0/1 is required as WM Trains do not have the relevant IP to perform this.