Rugby Borough Council
Site clearance to remove unwanted material and debris
Removal of surface vegetation and topsoil stripping
Re‐grading works to regulate levels, re‐profile existing slope and infill large hollow
Excavation into soft ground for new roads and footpaths
Installation of pre‐cast concrete and timber edgings
Installation of stone sub‐bases
Tarmac paving (standard asphalt concrete)
Stone paving (MOT Type 1)
Installation of new mains water service pipe (connection to mains water supply by others)
Installation of pillar standpipes with taps onto concrete pads
Soiling and seeding
Installation of wooden marker posts